<?xml version="1.0" encoding="UTF-8"?><rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:wfw="http://wellformedweb.org/CommentAPI/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
	xmlns:slash="http://purl.org/rss/1.0/modules/slash/"
	>

<channel>
	<title>Projects &#8211; WH Kemp</title>
	<atom:link href="https://www.whkemp.co.uk/projects/feed" rel="self" type="application/rss+xml" />
	<link>https://www.whkemp.co.uk</link>
	<description>Wiring Harnesses, Cable &#38; Control Box Manufacturers</description>
	<lastBuildDate>Thu, 20 Aug 2026 12:11:34 +0000</lastBuildDate>
	<language>en-GB</language>
	<sy:updatePeriod>
	hourly	</sy:updatePeriod>
	<sy:updateFrequency>
	1	</sy:updateFrequency>
	<generator>https://wordpress.org/?v=7.1.4</generator>

<image>
	<url>https://www.whkemp.co.uk/wp-content/uploads/whkemp2025-favicon-02-150x150.png</url>
	<title>Projects &#8211; WH Kemp</title>
	<link>https://www.whkemp.co.uk</link>
	<width>32</width>
	<height>32</height>
</image> 
	<item>
		<title>Rally Car EMC Systems Cable Harnesses</title>
		<link>https://www.whkemp.co.uk/projects/rally-car-emc-systems-cable-harnesses</link>
		
		<dc:creator><![CDATA[John Wyatt]]></dc:creator>
		<pubDate>Thu, 30 Oct 2025 09:57:45 +0000</pubDate>
				<category><![CDATA[news]]></category>
		<guid isPermaLink="false">https://www.whkemp.co.uk/?post_type=project&#038;p=6311</guid>

					<description><![CDATA[A company designing and building EMC systems for rally cars had built their own cable looms in-house with a small team, but the workload eventually outgrew their capacity. They approached WH Kemp to take over the builds. Technical drawings were limited, so the customer supplied physical cable loom samples instead. WH Kemp&#8217;s first task was [&#8230;]]]></description>
										<content:encoded><![CDATA[<p>A company designing and building EMC systems for rally cars had built their own cable looms in-house with a small team, but the workload eventually outgrew their capacity. They approached WH Kemp to take over the builds.</p>
<p>Technical drawings were limited, so the customer supplied physical cable loom samples instead. WH Kemp&#8217;s first task was to check the component requirements against these samples and source suitable parts, then replicate the samples and update the drawings as needed.</p>
<p>Within a short time, the customer had handed WH Kemp all of their cable loom builds, freeing their team to focus on design and sales. The quality of these looms was noticed by other businesses within the motorsport sector, and WH Kemp now builds looms for several other motorsport customers. Motorsport now represents one of the fastest growing parts of WH Kemp&#8217;s business.</p>
<h5 class="challenge">Challenge</h5>
<p>Limited in-house capacity to keep up with growing cable loom demand, with only physical samples available in place of full technical drawings.</p>
<h5 class="solution">Solution</h5>
<p>WH Kemp checked component requirements against the supplied samples, sourced suitable parts, and replicated the designs, updating drawings as required.</p>
<h5 class="outcome">Outcome</h5>
<p>The customer&#8217;s team was freed to focus on design and sales, and the quality of the work led to further motorsport customers, making motorsport one of WH Kemp&#8217;s fastest growing sectors.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>HVAC Wiring Loom Kitting Solution</title>
		<link>https://www.whkemp.co.uk/projects/hvac-wiring-loom-kitting-solution</link>
		
		<dc:creator><![CDATA[John Wyatt]]></dc:creator>
		<pubDate>Thu, 30 Oct 2025 09:57:00 +0000</pubDate>
				<category><![CDATA[news]]></category>
		<guid isPermaLink="false">https://www.whkemp.co.uk/?post_type=project&#038;p=6309</guid>

					<description><![CDATA[A HVAC customer came to us after being continuously let down by their previous cable harness supplier. As is often the case with WH Kemp&#8217;s new customers, this relationship began through a word of mouth recommendation. This customer required a variety of cable assemblies, delivered together as individual kits that their factory operators could fit [&#8230;]]]></description>
										<content:encoded><![CDATA[<p>A HVAC customer came to us after being continuously let down by their previous cable harness supplier. As is often the case with WH Kemp&#8217;s new customers, this relationship began through a word of mouth recommendation.</p>
<p>This customer required a variety of cable assemblies, delivered together as individual kits that their factory operators could fit into each machine, with each kit containing many cable assemblies. Their previous supplier rarely held all the items needed in finished stock to assemble a complete kit as one shipment, leading to frequent production line stops.</p>
<p>Within weeks, WH Kemp had built a portfolio of Wiring Looms that could be picked as required, enabling complete wiring kits for each machine to be sent to the customer when needed. Making this work reliably depends on two things, the right mix of cable assemblies being produced on time and held in stock, and a picking team diligent and efficient enough to assemble the many items each kit requires.</p>
<p>WH Kemp has invested heavily in ERP software and hardware in recent years, and it&#8217;s this investment in processes and people that supports on-time manufacture and efficient picking.</p>
<h5 class="challenge">Challenge</h5>
<p>Incomplete cable assembly kits from an incumbent supplier, causing frequent production line stops.</p>
<h5 class="solution">Solution</h5>
<p>A portfolio of Wiring Looms built and held ready for picking, supported by ERP software and hardware and a diligent, efficient picking team.</p>
<h5 class="outcome">Outcome</h5>
<p>Complete wiring kits delivered reliably and on time, removing the production line stops caused by the previous supplier.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Wiring Looms and Control Boxes for ATEX Zone Gas Transfer</title>
		<link>https://www.whkemp.co.uk/projects/wiring-looms-and-control-boxes-for-atex-zone-gas-transfer</link>
		
		<dc:creator><![CDATA[John Wyatt]]></dc:creator>
		<pubDate>Thu, 30 Oct 2025 09:56:04 +0000</pubDate>
				<category><![CDATA[news]]></category>
		<guid isPermaLink="false">https://www.whkemp.co.uk/?post_type=project&#038;p=6307</guid>

					<description><![CDATA[WH Kemp has worked in partnership with our customer&#8217;s engineers to develop and provide Control Panels and Wiring Looms that ensure the safe transfer of gas from ships. Our customer is a global leader in the design and manufacture of safety equipment. Traditionally, the company offered many versions of their safety equipment. With new management [&#8230;]]]></description>
										<content:encoded><![CDATA[<p>WH Kemp has worked in partnership with our customer&#8217;s engineers to develop and provide Control Panels and Wiring Looms that ensure the safe transfer of gas from ships. Our customer is a global leader in the design and manufacture of safety equipment.</p>
<p>Traditionally, the company offered many versions of their safety equipment. With new management on board, they decided to consolidate their product portfolio. Quality was of overriding importance throughout, since their products need to remain totally effective in the most hazardous of environments. Their engineering team, tasked with evaluating how to consolidate the portfolio, spent many hours working alongside our people on the shop floor, reviewing and testing different solutions. Wiring Looms and Control Boxes needed to be designed to cover many usage scenarios.</p>
<p>Through working alongside WH Kemp, the Control Box design has been completed, and we now build the Control Boxes and Wiring Looms used globally to aid the safe transfer of gas, often in ATEX Zone 1 and Zone 2 environments. The customer&#8217;s engineers have been consistently complimentary about the help and support received from our team, and the relationship continues today, now extending into further electromechanical sub-assemblies.</p>
<h5 class="challenge">Challenge</h5>
<p>Consolidating a safety equipment portfolio into Wiring Looms and Control Boxes that could cover many usage scenarios, without compromising reliability in hazardous environments.</p>
<h5 class="solution">Solution</h5>
<p>WH Kemp&#8217;s team worked alongside the customer&#8217;s engineers on the shop floor, reviewing and testing different design solutions until the Control Box design was completed.</p>
<h5 class="outcome">Outcome</h5>
<p>Control Boxes and Wiring Looms now used globally to aid safe gas transfer in ATEX Zone 1 and Zone 2 environments, with the partnership continuing into further electromechanical sub-assembly work.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Cable Harness Solution to Reduce Vehicle Off Road (VOR) Time</title>
		<link>https://www.whkemp.co.uk/projects/cable-harness-solution-to-reduce-vehicle-off-road-time</link>
		
		<dc:creator><![CDATA[John Wyatt]]></dc:creator>
		<pubDate>Thu, 30 Oct 2025 09:52:58 +0000</pubDate>
				<category><![CDATA[news]]></category>
		<guid isPermaLink="false">https://www.whkemp.co.uk/?post_type=project&#038;p=6305</guid>

					<description><![CDATA[WH Kemp&#8217;s people work alongside vehicle manufacturers to trial various Cable Harness options, especially where improvements are needed within legacy Cable Looms. Water ingress and vibration damage are typical issues that need to be addressed and overcome, and Cable Harnesses within buses face particularly demanding conditions, significant vibration, harsh weather, and powerful jet washing. WH [&#8230;]]]></description>
										<content:encoded><![CDATA[<p>WH Kemp&#8217;s people work alongside vehicle manufacturers to trial various Cable Harness options, especially where improvements are needed within legacy Cable Looms. Water ingress and vibration damage are typical issues that need to be addressed and overcome, and Cable Harnesses within buses face particularly demanding conditions, significant vibration, harsh weather, and powerful jet washing.</p>
<p>WH Kemp welcomes customers to our Westbury premises, and engineers from the UK&#8217;s largest bus manufacturer are frequent visitors to our team here. The company&#8217;s Directors were keen to explore WH Kemp&#8217;s ideas on how improvements could be made to solve the issues emerging with their imported Cable Looms.</p>
<p>Our NPI team suggested many improvements and worked alongside the customer&#8217;s engineers to develop a redesigned, fit-for-purpose Cable Loom.</p>
<h5 class="challenge">Challenge</h5>
<p>Premature issues with imported Cable Looms, caused by water ingress and vibration damage, in the demanding operating conditions of commercial buses.</p>
<h5 class="solution">Solution</h5>
<p>WH Kemp&#8217;s NPI team worked alongside the customer&#8217;s engineers, at the Directors&#8217; request, to develop a redesigned, fit-for-purpose Cable Loom.</p>
<h5 class="outcome">Outcome</h5>
<p>A redesigned Cable Loom developed collaboratively with the customer&#8217;s engineering team.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Wiring Looms for Flywheel-Based Hybrid Power Systems</title>
		<link>https://www.whkemp.co.uk/projects/wiring-looms-for-flywheel-based-hybrid-power-systems</link>
		
		<dc:creator><![CDATA[John Wyatt]]></dc:creator>
		<pubDate>Thu, 30 Oct 2025 09:50:37 +0000</pubDate>
				<category><![CDATA[news]]></category>
		<guid isPermaLink="false">https://www.whkemp.co.uk/?post_type=project&#038;p=6301</guid>

					<description><![CDATA[Engineers from Williams contacted WH Kemp to develop cable harnesses for their Hybrid Power Division, working on composite flywheel-based energy storage systems for the bus, truck and tram markets. When the business was later sold to GKN Hybrid Power, WH Kemp continued the relationship, supporting the same cable harness development work under new ownership. The [&#8230;]]]></description>
										<content:encoded><![CDATA[<p>Engineers from Williams contacted WH Kemp to develop cable harnesses for their Hybrid Power Division, working on composite flywheel-based energy storage systems for the bus, truck and tram markets.</p>
<p>When the business was later sold to <a href="https://www.gknautomotive.com/en/" target="_blank" rel="noopener">GKN Hybrid Power</a>, WH Kemp continued the relationship, supporting the same cable harness development work under new ownership.</p>
<p>The project explored various ways the technology could be applied across different vehicle types, with WH Kemp developing cable harness design concepts to support a range of vehicle applications alongside the customer&#8217;s engineers.</p>
<h5 class="challenge">Challenge</h5>
<p>Designing cable harnesses to support an advancing energy storage technology across a range of different vehicle applications.</p>
<h5 class="solution">Solution</h5>
<p>WH Kemp worked with the customer&#8217;s engineers to develop cable harness design concepts for a variety of vehicle types, continuing the relationship through a change in ownership of the business.</p>
<h5 class="outcome">Outcome</h5>
<p>Cable harness design support was successfully provided across a range of vehicle applications for this developing technology.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Airport Ground Support Equipment Build Acceleration</title>
		<link>https://www.whkemp.co.uk/projects/airport-ground-support-equipment-build-acceleration</link>
		
		<dc:creator><![CDATA[John Wyatt]]></dc:creator>
		<pubDate>Thu, 30 Oct 2025 09:48:45 +0000</pubDate>
				<category><![CDATA[news]]></category>
		<guid isPermaLink="false">https://www.whkemp.co.uk/?post_type=project&#038;p=6297</guid>

					<description><![CDATA[WH Kemp&#8217;s main GSE (Ground Support Equipment) customer was growing quickly, having built their Cable Harnesses and Control Panels internally with help from a small Wiring Harness firm. Over the years, specifications had been updated by the customer&#8217;s engineers, but these changes weren&#8217;t always reflected on the drawings. New directors joined the business, and reducing [&#8230;]]]></description>
										<content:encoded><![CDATA[<p>WH Kemp&#8217;s main GSE (Ground Support Equipment) customer was growing quickly, having built their Cable Harnesses and Control Panels internally with help from a small Wiring Harness firm. Over the years, specifications had been updated by the customer&#8217;s engineers, but these changes weren&#8217;t always reflected on the drawings.</p>
<p>New directors joined the business, and reducing build time while meeting lead time commitments became a key priority. They identified that the root cause of their delays was a combination of quality issues and late deliveries from their Cable Harness and Control Box supplier, with electrical faults consistently arising on first fitting. As a result, the company had built many hours of &#8220;tinker time&#8221; into their GSE build plan, just to correct electrical quality issues caused by faulty harnesses and control boxes.</p>
<p>The new directors needed a supplier with a <a href="https://www.whkemp.co.uk/why-choose-wh-kemp">history of delivering quality products on time</a>, at a price commensurate with their existing costs. The challenge was made harder still when WH Kemp discovered that many of the Cable Harness drawings didn&#8217;t include the latest specifications.</p>
<h4>Reconciling the Drawings</h4>
<p>WH Kemp&#8217;s team worked through the many Cable Harness drawings, noting the engineering changes that had accumulated over time. Differences between the golden samples and the drawings were identified and reconciled, and our team worked proactively with the customer to clarify product specifications and ensure every change was correctly incorporated into the latest drawings.</p>
<p>WH Kemp then supplied complete Cable Harness kits, ready to fit to each tractor, delivered on time.</p>
<h4>Taking on the Control Panel Build</h4>
<p>The customer had initially assigned the Control Panel builds to a specialist aerospace contract electrical manufacturer. After repeated failed attempts to achieve the required quality, WH Kemp was asked to take over the Control Panel builds too. Our Control Panels functioned perfectly from the outset, and the customer&#8217;s tinker time was eliminated, with build times reduced accordingly.</p>
<h4>The Result</h4>
<p>With everything in place, the customer received Cable Harness and Control Panel products delivered on time and of perfect quality, shaving over 12 hours off their vehicle build time. WH Kemp continues working alongside the customer&#8217;s engineers to keep drawings and specifications consistently up to date.</p>
<h5 class="challenge">Challenge</h5>
<p>Supplier quality issues and outdated drawings causing electrical faults on first fitting, requiring hours of tinker time per vehicle to correct.</p>
<h5 class="solution">Solution</h5>
<p>WH Kemp reconciled all Cable Harness drawings against golden samples, then took over both Cable Harness and Control Panel manufacture after a specialist aerospace supplier failed to meet the required quality.</p>
<h5 class="outcome">Outcome</h5>
<p>Over 12 hours removed from vehicle build time, with Cable Harnesses and Control Panels now delivered on time and of perfect quality.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Wiring Harness Solution for Military Aircraft Testing</title>
		<link>https://www.whkemp.co.uk/projects/wiring-harness-solution-for-military-aircraft-testing</link>
		
		<dc:creator><![CDATA[John Wyatt]]></dc:creator>
		<pubDate>Thu, 30 Oct 2025 09:44:53 +0000</pubDate>
				<category><![CDATA[news]]></category>
		<guid isPermaLink="false">https://www.whkemp.co.uk/?post_type=project&#038;p=6295</guid>

					<description><![CDATA[Engineers from a global military aircraft manufacturer were concerned about whether the Wiring Harnesses used in their on-board aircraft testing kits were being adequately maintained and replaced when necessary, at short notice. These harnesses need to be faultless, despite operating in challenging environments that can put them under significant strain. The engineers visited WH Kemp, [&#8230;]]]></description>
										<content:encoded><![CDATA[<p>Engineers from a global military aircraft manufacturer were concerned about whether the Wiring Harnesses used in their on-board aircraft testing kits were being adequately maintained and replaced when necessary, at short notice. These harnesses need to be faultless, despite operating in challenging environments that can put them under significant strain. The engineers visited WH Kemp, liked what they saw, and chose to work with us.</p>
<p>WH Kemp developed a dedicated process to meet this requirement. We build the Wiring Harnesses and always hold two spare sets in stock. As needed, we collect and replace the customer&#8217;s Wiring Harnesses with those held in reserve, then service the returned harnesses, repairing or replacing them in part or in full as required. This means WH Kemp always holds two complete sets of faultless Wiring Harnesses, <a href="https://www.whkemp.co.uk/services/supply-chain-integration">ready for dispatch at short notice</a>.</p>
<h5 class="challenge">Challenge</h5>
<p>Ensuring faultless testing harnesses are always available and can be replaced at short notice, given the demanding environments they operate in.</p>
<h5 class="solution">Solution</h5>
<p>WH Kemp built the harnesses and maintains two spare sets in permanent stock, collecting and replacing harnesses as needed, then servicing, repairing or replacing the returned sets.</p>
<h5 class="outcome">Outcome</h5>
<p>WH Kemp always holds two complete sets of faultless Wiring Harnesses, ready for dispatch at short notice.</p>
]]></content:encoded>
					
		
		
			</item>
	</channel>
</rss>
